Wednesday, January 19, 2011
29er ready to ship to the powdercoater
I know....the photos aren't very good but sometimes I finish late in the day and the result are these odd images of a completed frame at sunset. If you look carefully you can see the guides all lined up on the top tube. Once they are welded on, they are there.....straight or not ! This time I got it right.
These chainstays are gigantic....I hope the front derailleur dosen't hit the drive-side stay. It shuldn't as this bike will be 2x10 and have a higher fr. der. position than a micro drive triple.
Too bad the flash washed out all the detail as these welds were really nice. I'll do better next time with the camera.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment