Some of you might not have seen the process of a batch of frames being built assembly-line style before. Here's what it looks like during week one.....ten frames, all of them 7005 aluminum going to V.O.S., a team based in Monterey, Calif. The process starts with drawings based on fit information, then each headtube is cut and machined. The seat tube is cut and welded onto the BB shell. Next, the top tube is welded onto the headtube at the appropriate angle. After that the downtubes are welded on. Today I'll assemble as many of the front triangles as possible. Next week the rear stays and guide will go on. 10 frames, ten buisiness days.....err, maybe eleven-whatever it takes to get the frames build properly and off to the heat treater.
Friday, December 14, 2007
Subscribe to:
Post Comments (Atom)
3 comments:
I see one with a big fat down tube and my name on it..........AWESOME!
Sasser
I'm jealous!
AV,無碼,a片免費看,自拍貼圖,伊莉,微風論壇,成人聊天室,成人電影,成人文學,成人貼圖區,成人網站,一葉情貼圖片區,色情漫畫,言情小說,情色論壇,臺灣情色網,色情影片,色情,成人影城,080視訊聊天室,a片,A漫,h漫,麗的色遊戲,同志色教館,AV女優,SEX,咆哮小老鼠,85cc免費影片,正妹牆,ut聊天室,豆豆聊天室,聊天室,情色小說,aio,成人,微風成人,做愛,成人貼圖,18成人,嘟嘟成人網,aio交友愛情館,情色文學,色情小說,色情網站,情色,A片下載,嘟嘟情人色網,成人影片,成人圖片,成人文章,成人小說,成人漫畫,視訊聊天室,性愛,聊天室,情色,a片,AV女優
Post a Comment